Cupertino Sports Cell Tower

Location: 21113 Stevens Creek Boulevard

Applicant: Tom Johnson (TSJ Consulting Inc., for AT&T)

Property Owner: City of Cupertino

Architect: Vinculums

City Contact: Gian Paolo Martire, gianm@cupertino.gov

 

STATUS

As of October 21, 2020, the application has been withdrawn from the applicant. 

 

PUBLIC HEARINGS

Application has been deemed complete. The following are community outreach and public hearing dates:

  • City Council Study Session on Tuesday, May 7, 2019 at 5:30 p.m. at Community Hall
  • Planning Commission on Tuesday, May 28, 2019 has been postponed. Please continue to check in with Staff for updates.

APPLICATION SUMMARY

The City of Cupertino is reviewing an application by AT&T to locate a personal wireless service facility consisting of 16 panel antennas mounted on an 80 foot tall treepole, a base equipment station, and an emergency power generator at the Cupertino Sports Center located at 21113 Stevens Creek Boulevard. The proposed project applications are listed as follows:

 

  1. Height Exception (EXC-2014-14) to allow a personal wireless service facility consisting of 16 panel antennas mounted on an 80 foot tall treepole, a base equipment station, and an emergency power generator where a 55 foot tower is allowed.
  2. Development Permit (DP-2014-09) and Architectural and Site Approval (ASA-2014-14) to evaluate the location and aesthetics of a personal wireless service facility consisting of 16 panel antennas mounted on an 80 foot tall treepole, a base equipment station, and an emergency power generator at the Cupertino Sports Center.

Existing:

Existing-Sports-Cell-Tower.jpg

Proposed:

Proposed-Sports-Cell-Tower.jpg

 

Project Description(PDF, 596KB)

Arborist Memo Report(PDF, 5MB)

Coverage Map(PDF, 304KB)

EME Report(PDF, 994KB)

Noise Study(PDF, 671KB)

Plan Set_(PDF, 5MB)

Photo Simulations(PDF, 1MB)